Solar Regulations for Contractors

Solar Regs

In addition to the stamped structural certification from a MA Registered Design Professional submitted with the permit application, a Final Construction Affidavit is required from the General Contractor (CSL Licensee) as required by 780 CMR section 107.6.3 prior to the final Electrical Inspection.