Feasibility Study - 2015 (Current Public Safety Location)

In Fall 2015, the Public Safety Study Committee engaged Donham & Sweeney to assist with a Feasibility Study.  A copy of their final report is displayed below, along with the various draft reports on space needs that led to the final report. 

Finally, the Committee has also developed a presentation of the sites considered for a potential Public Safety Facility with the pros/cons of each listed.

If you have a question on the space needs identified or the potential site options examined, please feel free to e-mail the Committee by clicking "Ask the Committee" to the left.